Comparison between Shima Seiki 7GG and Stoll Machine 3GG

SL Topics Shima Seiki Stoll 1 Knitting Speed 1.20 m/s   1.20 m/s 2 Broken Needle 25% 20% 3 Oiling   Every 8 to 12 operating hour run 20 gm oil need for one machine   Every 12 operating hour run 35 gm oil need for one machine   4   Cleaning Every 8 to 12 operating hour should be cleaning Every   12 operating hour should be cleaning 5 Spare Parts   Payment after delivery Payment before delivery 6 Feeder Quantity 9 Feeder (Limitation of   knit 7 different colors) 12 Feeder   (Limitation of   knit 10 different colors) 7 Sub Roller Quantity One Sub Roller Two Sub Roller (Increase production quality) 8 Needle Price 75 Tk 143 TK 9 Weight 660 Kg 1028 Kg 10 Cone Stands Travelled in Top Bed Fixed in Top bed 11 Knitting Bed 45 inch 45 inch 12 Power Consumption 1.28 KW 1.7 KW

Sewing Machine Schedule Maintenance

Daily Sewing Machine Schedule Maintenance: 1.      Check the oil level if it below the lower level  2.      Test run as a general. 3.      Clean the machine every 8 to 12 operating hour. Weekly Sewing Machine Schedule Maintenance: 1.        Check the lube oil pot to refill before oil before oil drops below the low level. Monthly Sewing Machine Schedule Maintenance: 1.        Clean the dust from all motor timing belts.  Quarterly Sewing Machine Schedule Maintenance:  1.        Grease the take down roller driven gear and sub roller driving gear. Yearly Sewing Machine Schedule Maintenance:   1.        Grease the all moving parts. 2.        Clean the all circuit board by using electronic contact cleaner.

Jacquard Machine Schedule Maintenance (SHIMA SEIKI, Hongqima and Stoll)

Daily Jacquard Machine Schedule Maintenance : 1.      Remove the dust at the yarn path or between tension disks from top tension equipment every 8 to 12 operating hour. 2.      Remove the dust on the yarn path from side tension every 8 to 12 operating hour. 3.      Remove the dust from yarn gripper/yarn cutter device every 8 to 12 operating hour. 4.      Clean the needle beds (needles and jack parts) with waste fabric. After that remove the dust in the grooves of the needle bed by using the air gun or needle bed cleaner (sold separately) every 8 to 12 operating hour. 5.      Clean the selector and select jack with waste fabric every 8 to 12 operating hour. 6.      Clean away any dust, oil, broken needles etc on the oil protection covers under the needle beds every 8 to 12 operating hour. 7.      Clean the yarn feeders every 8 to 12 operating hour. 8.      Clean the filter in the relay box every 8 to 12 operating hour.

Air Conditioning Schedule Maintenance

Daily Air Conditioning Schedule Maintenance: 1.        Clean the indoor filter. 2.        Run a general air conditioner test. Weekly Air Conditioning Schedule Maintenance: 1.        Check the power consumption. Monthly Air Conditioning Schedule Maintenance: 1.        Check the outdoor fan blades and indoor blower. 2.        Check the compressor and refrigerant tubing. 2.          Quarterly Air Conditioning Schedule Maintenance:  1.        Clean and wash the evaporator coil of outdoor. 2.        Lubricate moving parts. 3.        Clean the condenser unit. Yearly Air Conditioning Schedule Maintenance:  1.        Clean coil and straighten damaged fins on both the indoor and outdoor units. 2.        Check all electrical connections, controls and safety functions. 3.        Check operation safety control and compressor contactor. 4.        Check suction and discharge operating pressure.