Sedimentation Tanks : 1. Sediment of the clarifier must be collected to the sludge thickening bed. 2. Over flow is being taken to the intermediate tank by means of gravity. 3. Time Interval for sludge removal should not be exceeded 3 hours. Key Process Parameters : TSS at Suparnant (Over Flow), COD and BOD Intermediate Tanks : Over flow from sedimentation tank is collected in this tank for further treatment. Key Process Parameter : Level of Water to avoid the dry run of Pumps.