Skip to main content

Posts

Showing posts with the label Jacquard Machine Schedule Maintenance

Jacquard Machine Schedule Maintenance (SHIMA SEIKI, Hongqima and Stoll)

Daily Jacquard Machine Schedule Maintenance : 1.      Remove the dust at the yarn path or between tension disks from top tension equipment every 8 to 12 operating hour. 2.      Remove the dust on the yarn path from side tension every 8 to 12 operating hour. 3.      Remove the dust from yarn gripper/yarn cutter device every 8 to 12 operating hour. 4.      Clean the needle beds (needles and jack parts) with waste fabric. After that remove the dust in the grooves of the needle bed by using the air gun or needle bed cleaner (sold separately) every 8 to 12 operating hour. 5.      Clean the selector and select jack with waste fabric every 8 to 12 operating hour. 6.      Clean away any dust, oil, broken needles etc on the oil protection covers under the needle beds every 8 to 12 operating hour. 7.      Clean the yarn feeders every 8 to 12 operating hour. 8.      Clean the filter in the relay box every 8 to 12 operating hour.