Skip to main content

Posts

Showing posts with the label Sewing Machine Schedule Maintenance

Sewing Machine Schedule Maintenance

Daily Sewing Machine Schedule Maintenance: 1.      Check the oil level if it below the lower level  2.      Test run as a general. 3.      Clean the machine every 8 to 12 operating hour. Weekly Sewing Machine Schedule Maintenance: 1.        Check the lube oil pot to refill before oil before oil drops below the low level. Monthly Sewing Machine Schedule Maintenance: 1.        Clean the dust from all motor timing belts.  Quarterly Sewing Machine Schedule Maintenance:  1.        Grease the take down roller driven gear and sub roller driving gear. Yearly Sewing Machine Schedule Maintenance:   1.        Grease the all moving parts. 2.        Clean the all circuit ...