Daily Sewing Machine Schedule Maintenance:
1.
Check the oil level if it below the lower level
2.
Test run as a general.
3.
Clean the machine every 8 to 12 operating hour.
Weekly Sewing Machine Schedule Maintenance:
1.
Check the lube oil pot to refill before oil
before oil drops below the low level.
Monthly Sewing Machine Schedule Maintenance:
1.
Clean the dust from all motor timing belts.
Quarterly Sewing Machine Schedule Maintenance:
1.
Grease the take down roller driven gear and sub
roller driving gear.
Yearly Sewing Machine Schedule Maintenance:
1.
Grease the all moving parts.
2.
Clean the all circuit board by using electronic
contact cleaner.
Comments
Post a Comment