Chemical Dosing Tank:
Two dosing
pumps are installed to dose the coagulant and flocculants accordingly.
Key Process Parameters: Dosing Chemical.
Sedimentation Tanks:
1.
Sediment
of the clarifier must be collected to the sludge thickening bed.
2.
Over
flow is being taken to the intermediate tank by means of gravity.
3.
Time
Interval for sludge removal should not be exceeded 3 hours.
Key Process Parameters: TSS at Suparnant (Over Flow), COD and BOD