Starting procedure of Diesel Generator after 30 days shutdown
If one shutdown the engine for more than 30 days to
make sure the engine receives the correct oil flow through the lubricating oil
system by following steps
-
Disconnect the electrical wire from the
fuel pump solenoid.
-
Rotate the crankshaft, using the
starting motor, until oil pressure appears on the gauge or the warning lamp
goes out.
-
Connect the electrical wire to the fuel
pump solenoid valve.
-
Start the engine as like as normal
starting procedure
Comments
Post a Comment